Knowledge base
Book
Support manuals and servicing guides for every piece of equipment. Searchable in plain language by your engineers, customers or AI agents.
Knowledge
7 documents
ER-AA-330Fault guide
Reactor coolant pump No. 1 seal degradation
ARP 1-MB4 E-6Procedure
Annunciator response — RCP seal leak-off high
TS 3.4.13Reference
RCS operational leakage — limits and required actions
TS 3.8.1Reference
AC sources — operating
MA-AA-212Procedure
Validating a suspect RTD or thermocouple
SY-AA-118Reference
Condenser performance and circulating water fouling
HU-AA-104Safety
Clearance and tagging — safety-related equipment
ER-AA-330Fault guide
Reactor coolant pump No. 1 seal degradation
Applies toWestinghouse 93A-1Westinghouse 93AByron-Jackson N-9000
Limits — Westinghouse 93A-1 seal package
- Seal injection flow, per pump
- 6–10 gpm
- Injection filter ΔP
- < 20 psid
- No. 1 leak-off, normal
- 1.5–3.5 gpm
- No. 1 leak-off, annunciator
- 4.5 gpm
- No. 1 leak-off, Tech Spec limit
- 6.0 gpm
- Seal water outlet temperature
- < 175 °F
- Frame vibration, alarm
- 8.0 mils
- Package replacement, lead time
- 11 days
Point an agent at it.
Book is searched by meaning, not by keyword, so a symptom finds the guide that covers it. The same search is an MCP server, which puts every manual in the plant behind whichever client is already open.
claude
mcp add --transport http millwright
https://mcp.millwright.sh
Added millwright. 9 tools.
Claude Code
Ask a question in your own words and get the page back, with the document it came from.
what is the tech spec limit on No. 1 seal leak-off?
Codex
The same server from the CLI already open beside your work. No second account and no plugin.
millwright9 tools
Anything that speaks MCP
The tools are the ones the interface uses. An agent cannot read a document a person could not.
See it running on your own plant.
We are onboarding a small number of operations teams. Three questions, and we will be in touch.